Request a Quote

Shangli accepts orders from 1 piece. Lead time is around 15–40 days after drawing confirmation and receipt of a 30% deposit. Payment is by T/T: 30% deposit before production and 70% balance before shipment. Prices are quoted FOB Shanghai, China. Motors are shipped in standard export wooden packaging for sea freight, with a test report and product quality certificate, and are covered by an 18-month warranty from delivery or 12 months from customer acceptance, whichever comes first. Witness factory acceptance tests (FAT) are available.

Ordering terms at a glance

Minimum order quantity1 piece
Lead timeAround 15–40 days after drawing confirmation and receipt of the 30% deposit
Payment termsT/T: 30% deposit before production, 70% balance before shipment from the factory
IncotermsFOB Shanghai, China
PackagingStandard export wooden packaging for sea shipment
Factory acceptance testWitness FAT available
Documents suppliedTest report and product quality certificate
Warranty18 months from the date of delivery or 12 months from the date of customer acceptance, whichever comes first
Export marketsSoutheast Asia, the Middle East, Central Asia, Africa and other regions

How an order works

  1. Send your enquiry. Share the application, output, voltage and frequency, speed, mounting arrangement, enclosure or Ex marking, and quantity. A nameplate photo of the existing motor is also helpful.
  2. Technical confirmation. Our engineers confirm the motor configuration and send the quotation together with outline drawings and data sheets.
  3. Drawing approval and deposit. You approve the drawings and pay the 30% deposit by T/T. The lead time starts from this point.
  4. Production. Typical lead time is around 15–40 days, depending on the motor series, configuration and quantity.
  5. Testing and FAT. Every motor is tested before dispatch. If required, you or your inspector can witness the factory acceptance test.
  6. Balance payment. The 70% balance is paid by T/T before the goods leave the factory.
  7. Packing and shipment. Motors are packed in export wooden cases for sea freight and delivered FOB Shanghai, with the test report and product quality certificate.

Minimum order quantity

The minimum order quantity is one piece, so you can order a single replacement motor, a sample for evaluation or a full project quantity.

Lead time

Lead time is around 15–40 days and is counted from drawing confirmation and receipt of the 30% deposit. The exact time depends on the motor series, frame size, special requirements and order quantity, and is confirmed in the quotation.

Payment terms

Payment is by telegraphic transfer (T/T): 30% of the order value as a deposit before production starts, and the remaining 70% before the goods are shipped from the factory.

Incoterms and shipping

Quotations are made on an FOB Shanghai, China basis. Under FOB, Shangli delivers the goods on board the vessel at the port of Shanghai, and the buyer arranges ocean freight and insurance from that point.

Packaging

Motors are packed in standard export wooden packaging suitable for sea shipment. Please tell us about any special marking or packing requirements in your enquiry.

Factory acceptance test (FAT)

Witness FAT is available. You or a third-party inspector can attend the factory tests before shipment; please let us know when placing the order so the test can be scheduled. See our manufacturing and testing facilities.

Documents supplied with the goods

  • Test report
  • Product quality certificate

Certification documents such as ATEX, CCC or explosion-protection certificates depend on the motor model; see Quality & Certifications and ask us to confirm coverage for your configuration.

Warranty

The warranty period is 18 months from the date of delivery or 12 months from the date of customer acceptance, whichever comes first.

Export markets

Shangli motors have been exported to Southeast Asia, the Middle East, Central Asia, Africa and other regions. Project references on this website include pumping stations and firewater systems in Spain, turf irrigation in the United Kingdom, a pump manufacturer in Russia, seawater firefighting pumps in Angola, oilfield equipment in Venezuela and fan manufacturing in Malaysia. See our case studies.

What to include in your enquiry

  • Application and driven equipment (pump, fan, compressor, etc.)
  • Rated output (kW or HP), voltage, frequency and speed
  • Mounting arrangement (B3, B5, B35, V1…) and frame size if replacing an existing motor
  • Enclosure (IP rating), Ex marking or hazardous-area requirements
  • Quantity and required delivery date
  • Nameplate photo or data sheet of the existing motor, if any

You can check performance data and mounting dimensions in our Motor Data & Drawings section before sending your enquiry.

Frequently asked questions

Can I order just one motor?

Yes. The minimum order quantity is one piece.

How long does delivery take?

Lead time is around 15–40 days after drawing confirmation and receipt of the 30% deposit, depending on the motor series, configuration and quantity.

What payment terms do you accept?

T/T, with a 30% deposit before production and the 70% balance before shipment from the factory.

Which Incoterms do you quote?

Our quotations are FOB Shanghai, China.

Can we witness the factory acceptance test?

Yes. Witness FAT is available; please request it when placing the order.

What warranty do you provide?

18 months from the date of delivery or 12 months from the date of customer acceptance, whichever comes first.

Send an Enquiry

Please share your requirements and contact details. Our team will get back to you.

WhatsApp: +8615523831294 +8615523831294 [email protected]

Home

Call

Back to Top

WhatsApp

Message